How We Hand Over a 1,200 m2 Office Fit-out in Warsaw

This is not a generic “types of fit-out” article. It is our practical delivery model: how we split zones, when we run quality reviews and what must be ready before the investor allows the next team or starts a partial handover.

We plan by zones, not only trades

Reception, meeting rooms, open space, back-of-house and circulation all have different handover logic and different risk points.

We inspect before the finish layer

Geometry, access panels, installation penetrations and ceiling readiness are checked before painting and flooring hide mistakes.

We hand over ready-to-use zones

A zone is not “done” when trades leave. It is done when the investor or tenant can equip it or review it without reopening works.